Steve Golubov
79d 11h

Formula Input into Cost Each

Under Review

Formula Input:

I would like to enter in "ZZ" as you can in PlanSwift a formula like 53.15 * 0.33 into the "Cost Each" field, the system will multiply these two numbers together, as you know. Here, $53.15 represents labour rate (such as hourly wage), and 0.33 is a factor or percentage that adjusts the cost based on labor input per cubic meter (production rates). Labour cost per CU M would be $17.54


Unit Change to $/m³

To make the meaning of this number clear ($17.54), you change the unit label to "$/m³", which indicates "dollars per cubic meter." This makes the number understandable as a cost per volume unit rather than just a raw dollar amount.


In future would you please consider this request?

0
James Allred zzTakeoff75d 18h

Hi Steve! Thank you for clearly spelling out this feature request. I'll pass it along to the development team for review.