Percentage Increase

Under Review

Hi

I’m not sure if this was discussed before.

If a dropdown box can be made, let’s say material goes up by 5% this quoter then just add 5% to that type of material and will increase by 5% in every part of your assembly.

Let’s say there are few different types of materials, like Concrete, Steel Reenforcing Lamber, etc...

Just choose the relevant material that need to be increased on the drop box and increase it by the relevant percentage.

The same for labor & equipment, so you don't have to do one by one in your data.

3
Jes 32d 20h

Yes this would be helpful for me as well rather than having to go through each set of items on the takeoff


Maybe the solution is a checkbox or something where if checked, all those item types will be increased by the percentage specified, while the rest will be left at whatever you manually put in/defaulted them to

Heber Allred zzTakeoff32d 18h

Thanks for the input 👍🏻

Steve G 32d 13h

Hi Heber,

I'm using PlanSwift & WinEst. The percentage Idea come from WinEst and works okay.

The same can be done for Tax as in PlanSwift.