Hello All,
Here is an idea and way to calculate "crew hrs" using an "Item". I use this to figure out a crew hour rate to install a certain size pipe, at an average depth, between two points. (manhole to manhole in my case). I have made Production rate variables so it can easily be changed depending on the size and type of pipe. Hope this is helpful to someone.
