Features
Trades
Testimonials
Pricing
Community
844-994-7386
Login
Signup
Home
Features
Trades
Testimonials
Pricing
Community
Login
Features
Trades
Testimonials
Pricing
Community
844-994-7386
Community
All Channels
Q & A
Feature Requests
Bug Reports
Developers / AI / MCP
Project Showcase
Humor & Memes
Plugins (Installed)
Integrations (In Progress)
Ediphi
BidBow
Google Drive
Google Sheets
Blog
Product Updates
Inside Track
Help Center
Training Videos
Documentation
Q & A
New Post
Got questions? This is the place to ask! Connect with other users and get the answers you need.
All Statuses
Planned
Under Review
In Progress
Completed
Closed
[No Status]
Ready to Test
All
Planned
Under Review
In Progress
Completed
Ready to Test
All Statuses
Planned
Under Review
In Progress
Completed
Closed
[No Status]
Ready to Test
Adding new scale
522d 18h
Is it possible to add one new scale - 1" = 5'?
4 Replies
Completed
Drag and Drop Takeoffs not working when "Group by" is used in the Takeoffs tab
527d 17h
In the Takeoffs tab, when I group by folder, layer, or takeoff type then I can no longer drag and drop takeoffs (or folders) up or down in the lis...
1 Reply
Completed
PS Import File Scramble
528d 20h
When I imported my Planswift job, my plans all get scrambled up and don't appear in order or in the folders in which they live. Any thoughts?
2 Replies
Completed
Manuel Organization In Reports
529d 17h
Hello! I would like to know if there is a way to manually move take off assemblies around in the reports tab. If not, there totally should be!
1 Reply
Planned
SCALING
529d 17h
Is it possible to create a new know scale that is not in the list, for example 1" = 5'? Is it possible to see what scale was created when we scale...
1 Reply
Planned
Excel integration?
529d 23h
I rely heavily on Excel in my work. I am a huge fan of the way PS could maintain a live link to a takeoff despite the quirkiness of the interface....
1 Reply
Planned
Arch instead of straight line
535d 16h
Is it possible to draw an arch instead of straight line? Before it was "A" shortcut, but now it doesn't work.
9 Replies
Completed
Template Variables
537d 3h
I bid underground piping, I need to build a template with 4 "Variables" that indicate Elevations, starting rim, starting invert, ending rim and en...
7 Replies
Planned
Takeoffs in Page Column
541d 13h
Is there a way to hide the quantities in the page column on the left or turn it off completely? I accidentally deleted my takeoffs.
5 Replies
Completed
Is there a way to enable viewports (different scales on the same page)?
541d 18h
Is there a way to enable viewports to perform takeoffs in a drawing that uses a scale different from the page scale? If not, does ZZ plan on imp...
4 Replies
Completed
Roof Slope SQFT Calculation
541d 20h
Is there a way to add the roof slope into an area so the sqft calculation is accurate?
5 Replies
Completed
Changing a Property from Linear to Area
541d 21h
I used the Schedule tool and inadvertently kept a linear for sidewalks. If there was an option to add a width or depth parameter this would be fin...
3 Replies
Completed
Dimensions
541d 21h
How do i hidden my dimensions that i mark up on the drawings.
2 Replies
Completed
Folder Organization
541d 21h
Hello, I am testing out zz, currently a Planswift user, does zz have a way to breakdown items so you can view/export them separately? I bid civ...
3 Replies
Completed
Will there be a feature to Direct Query from Excel into ZZTakeoff
564d 9h
Was wondering if/when you would be allowing to direct query from Excel into the system? Also in terms of architecture on what comes out would the ...
2 Replies
Under Review
Is there a way to rename a project?
584d 18h
Is there a way to rename a project?
4 Replies
Completed
Estimating
646d 1h
The takeoff app looks good, but are there plans to add estimating to it?
5 Replies
Planned
Deleting a Workspace?
646d 22h
Does anyone know if it is possible to delete a Workspace we are no longer using?
6 Replies
Under Review
Extract Schedule - Change Takeoff Type
647d 12h
When you use the Extract Schedule tool, takeoff items are created for each item in the schedule. The system seems to infer the takeoff type (count...
11 Replies
Completed
Organizing Documents
652d 20h
For large Commercial Projects I upload everything including Specs. I do this to highlight and even add a fake "takeoff" item as a specific note, ...
2 Replies
Completed
Previous
Next