Features
Trades
Testimonials
Pricing
Community
844-994-7386
Login
Signup
Home
Features
Trades
Testimonials
Pricing
Community
Login
Features
Trades
Testimonials
Pricing
Community
844-994-7386
Community
All Channels
Q & A
Feature Requests
Bug Reports
Developers / AI / MCP
Project Showcase
Humor & Memes
Plugins (Installed)
Integrations (In Progress)
Ediphi
BidBow
Google Drive
Google Sheets
Blog
Product Updates
Inside Track
Help Center
Training Videos
Documentation
Steve Golubov
Community Profile
All
Posts
Comments
Project Variable Climate Zone
184d 19h
okay, I'm not sure then but you can trick it a bit and say have 7.001 and on the other one has (7)
Project Variable Climate Zone
184d 19h
Hi MiquelYou’re on the right track; you just need to follow the Value & Name structure. In your example, it’s currently set up the other way around.
Grid Tool, Joist Tool, and Beam Tool
186d 0h
Hi Heber,It would be best if both options were available.Keep beams/joists grouped by each area object for clear takeoff review and verification but also allow a totalled view for overall quantitie...
Option to remove to grouping outline in Excel export
186d 17h
A checkbox would be awesome, cheers!
Can the the new sum function feature be used to sum takeoffs to a manual takeoff?
187d 22h
@Heber,Thank you so much for the explanation.
Can the the new sum function feature be used to sum takeoffs to a manual takeoff?
188d 9h
Wrong Subject for my Question. I've tried to do sum('Cost Each') and it is not working for me
Get Labor Production to a Estimating Tool
189d 16h
As always, good question @Kyle! I’ve been working through the same thing. Still not sure if this answers your questions, I'm on my second drink :), still holydaying. One way I see it is to separate...
SKU Use Cases??
189d 16h
Hi @Kyle,Not using it yet, still working out how it fits into a real estimating workflow. If SKU is meant to standardise products and drive quantities & pricing consistently across jobs, I can see ...
Feature Idea: Global Estimate Adjustment by Dollar Value
189d 20h
That's a good news Kyle, thanks mate.
Auto-Updating Estimates from Lists
191d 23h
Hi @Heber,This request is now 229 days old and remains a critical workflow requirement for many of us. The current workarounds add significant manual effort and introduce risk of inconsistent prici...
Hidden Properties Improvement
194d 19h
@Kyle,100% agree with you mate
Support for Multiple Takeoff Projects Within a Single Project
194d 22h
Hi Sam,Firstly, I’d like to say I really appreciate all the ongoing improvements being made to zzTakeoff, it’s clear a lot of effort is going into making it a powerful estimating tool. Similar as @...
Control Over Decimals and Rounding at Parent Level
196d 0h
@Stephen,Yes, it is under Qty, other ways it will come up with 2 decimal places.Concrete Edge Beam (EB) - [Linear]m L x [Width]m W x [Depth]0m D, Reinforced (3-TM12 Cage), Pumped.
Change units?
196d 11h
Change units?
196d 11h
Hi KevinI've learned this yesterday from Stephen. You need to change the units inside the Unit Box from EA to nr.First, change the Parent to Item. In the top right, click on the three-square blocks...
Control Over Decimals and Rounding at Parent Level
196d 22h
Hi Stephen,Thank you so much, that works for me to.Now we just need it to display the same value in the Name, Text with Tag as well. At the moment, it’s still showing 58.389 m instead of the rounde...
Is there a list of formula types available for zz
197d 9h
Hi Kevin,Try this formula([Segment count]*2)+if([Linear:m]<=2.4,0,floor([Linear:m]/2.4)-1) The formula counts 2 ends per segment, then adds the number of joints required based on 2.4m board lengths...
Control Over Decimals and Rounding at Parent Level
197d 21h
Hi Sam,Thanks again, good stuff, the round-up is working well following your instructions.The only issue I’m running into now is with the UOM. When I to enable the rounding, the unit switches from...
Control Over Decimals and Rounding at Parent Level
197d 23h
Thanks again Sam, much appreciated.I completely forgot about this feature, I’ve now updated it to show two decimal places.Looking forward to the roundup update when it’s available.
Can anyone help on a "if" formula?
199d 8h
Hi Kevin,At the moment, zzTakeoff does not reliably support checking whether a description contains specific text such as “kite” within a formula. I found that all my test formulas with " " are not...
Custom properties
200d 0h
if([Coverage]<=0,0,[Area]/[Coverage])This allows the you to change products and have the quantity update automatically based on the selected product coverage.Wastage and roundup do not need to be b...
Collecting Input: Area Labels / Segment & Linear Labels
202d 23h
I like the idea @KoryNameDescription [text variable]QtyUOM I would add to it:Print Intelligence with Different outputs:For estimator:Full breakdownFor site:Simplified:QtyNotesDaysFor client:Clean l...
Linear TakeOff Display Options
203d 21h
Hi,I have asked for this long time ago to, good to see has been asked again.
Collecting Input: Array Command
203d 22h
Hi Heber,I would not let users go anywhere near 100 × 100 by default. For a construction takeoff workflow, a realistic max depends on what is being arrayed:For most normal useLinear repeat X or Y: ...
Bug Report – Interface Display Issue (Zoom/Scaling Problem)
206d 18h
Hi Sam,Thank you for your support.Hopefully this doesn’t happen again, it definitely gave me a bit of a scare. All other programs, including zzTakeoff Testing Station, were working fine, so it was ...
Previous
Next